Book Demo NifTycoon
Security Architecture Verified

NifTycoon is certified ISO/IEC 27001:2022 for Enterprise Security Governance protocols.

Schedule Free Consultation
NOMS-C Project Management System v1.2.2

Total Engineering & Financial Command Over Every Construction Site

Eliminate the disconnect between site engineers and head office accounts. NOMS-C enforces BOQ rate baselines, material shrinkage control, GPS muster rolls, and cash margin transparency.

INTERFACE STREAM SAMPLE OVERVIEW
100%
BOQ vs PO Price Matching
-25%
Raw Material Leakage
Zero
Off-Site Proxy Clock-Ins
Real-Time
Contractor Balance Audit
STAGE 01 // SCOPE & BASELINE

Project Setup, Contracts & Estimation

04 Command Modules Baseline Phase
MODULE 01

Centralized Multi-Project Portfolio Dashboard

Business Capability

A single multi-site control center showing all active tenders, civil works, and handed-over developments. The Managing Director can evaluate physical progress and financial health across states without opening multiple spreadsheets.

Managing Director's Advantage

Instantly identify delayed sites in Hyderabad or Bengaluru before late completion penalties arise.

Direct Pipeline: Links to Master Projects, Schedule & Timeline, and Executive Audits.
PORTFOLIO MONITOR // LIVE STATUS: ONLINE
Project Name Region Site Incharge Status Execution Capex (₹)
Zenith Tower A Bengaluru R. Nair On Track 62% 8.50 Cr
Cyber Gateway Hyderabad S. Rao Delayed 38% 12.00 Cr
Metro Warehousing Chennai K. Iyer On Track 75% 3.20 Cr
MODULE 02

Master Project Dossier & Contract Repository

Business Capability

The comprehensive digital record for a single project: sanctioned client contracts, GFC (Good for Construction) drawings, approved amendments, assigned PMs, and sanctioned expenditure caps.

Risk Protection

Prevents site engineers from executing works on obsolete architectural revisions or uncertified contractor scope changes.

PROJECT RECORD // CB-014 HYDERABAD SANCTIONED
Project Section Registered Parameters Audit State
Assigned Leadership Senior DGM + 2 Resident Engineers Assigned
Drawing Revisions Architectural & MEP (Rev 3.2) Locked
Approved Budget ₹12,00,00,000 (Twelve Crores) Approved
MODULE 03

Bill of Quantities (BOQ) Rate & Estimation Master

Business Capability

Itemized work package estimation detailing work breakdown structures (WBS), units of measurement, quantity allowances, and tender rates. Establishes the commercial expenditure ceiling for every trade.

Margin Protection

Every site purchase requisition is automatically verified against the approved BOQ line allowance. Prevents unauthorized indenting beyond tender limits.

BOQ LINE AUDIT // CIVIL FOUNDATION ESTIMATE LOCKED
Line Description Unit Quantity Sanctioned Rate Amount (₹)
Earthwork Excavation m³ 100 ₹2,000 2,00,000
M25 Grade Concrete m³ 60 ₹6,500 3,90,000
Flyash Brick Masonry m² 250 ₹900 2,25,000
Substructure Allocation Sum ₹8,15,000
MODULE 04

Milestone Scheduling & Critical Path Timeline

Business Capability

A project activity schedule linking target start dates, completion milestones, and engineer accountability against actual on-site progress.

Delay Containment

Flags structural phase delays instantly, allowing Project Directors to adjust concrete pours or rebar deliveries before the critical path is affected.

SCHEDULE MONITOR // GANTT LOGIC CYCLE: 180 DAYS
Phase / Activity Scheduled Start Scheduled End Completion Condition
Excavation 01 Apr 20 Apr 100% Completed
Raft Foundation 21 Apr 30 May 80% On Track
Superstructure Concrete 01 Jun 30 Sep 35% Lagging
CREDIBILITY & OUTCOMES

Proven Field Adoption & Execution Benchmarks

Industry Validated Live Stats
PORTFOLIO REACH
50+

Builders & General Contractors

Active enterprise infrastructure developers, residential builders, and MEP subcontractors managing high-volume operations nationwide.

Scaled Multi-Site Deployments
CLIENT SATISFACTION
5.0 / 5.0

Flawless Review Benchmark

Rated across engineering teams, site store managers, and corporate accounts for zero downtime and intuitive mobile usability on active sites.

Verified User Satisfaction
PILOT RETENTION
98/100

Demo-to-Deployment Ratio

98 out of 100 construction business owners who evaluate NOMS-C on their active BOQ spreadsheets proceed to commercial license onboarding.

High Evaluation-to-Live Ratio
Audited figures based on live enterprise subscriptions and active developer deployments across major metropolitan regions.
Schedule Your Walkthrough →

CONSTRUCTION ERP - PRICING PLANS

MODULES

FREE

Get Started
2 Users | 2 Projects

STARTER

For Small Builders
10 Users | 10 Projects

GROWTH

For Growing Companies
30 Users | 50 Projects

PROFESSIONAL

For Established Businesses
100 Users | Unlimited Projects

ENTERPRISE

For Large Construction Groups
Unlimited Users | Unlimited Projects
Own Full Assets
All Projects at One Place ✓ ✓ ✓ ✓ ✓
Projects ✓ ✓ ✓ ✓ ✓
BOQ - Bill of Quantities - ✓ ✓ ✓ ✓
Schedule and Timeline - ✓ ✓ ✓ ✓
Material Management ✓ ✓ ✓ ✓ ✓
Stock Management - ✓ ✓ ✓ ✓
Warehouse Management - - ✓ ✓ ✓
Site Warehousing - - ✓ ✓ ✓
Procurement Governance - - ✓ ✓ ✓
Approval Workflow - - - ✓ ✓
Purchase Orders - ✓ ✓ ✓ ✓
Attendance with Geographic Location - - ✓ ✓ ✓
Roles and Accountability - - ✓ ✓ ✓
Customer and Supplier Management ✓ ✓ ✓ ✓ ✓
Customer Payments - - ✓ ✓ ✓
Supplier Payments - - ✓ ✓ ✓
Budget vs Actual - - - ✓ ✓
Profitability Tracking - - - ✓ ✓
Advanced Reports - - - ✓ ✓
Monthly Pricing ₹0 /month GET STARTED ₹999 /month CHOOSE PLAN ₹2,999 /month CHOOSE PLAN ₹5,999 /month CHOOSE PLAN ₹14,999+ /month CONTACT SALES
SCHEDULE SYSTEM EVALUATION

Deploy NOMS-C Across Your Sites

Connect with our engineering software specialists. We configure the demo around your real-world BOQ templates, site store processes, and management approval hierarchies.

Role-Based Security
Encrypted multi-site data isolation with custom permissions.
Guided Onboarding
Direct migration of historical master spreadsheets and active vendor databases.

Book an Executive Demo & Free Trial

Fill in your organization details to schedule a live walkthrough.

Enterprise-grade confidentiality. No third-party data sharing.
STAGE 02 // INVENTORY & LOGISTICS

Materials, Storage & Multi-Store Warehousing

04 Logistics Modules Leakage Control
MODULE 05

Material Indenting & Consumption Tracking

Business Capability

Reconciles ordered quantities, gate receipts, storekeeper issues, and returns. Highlights deviations between estimated mix design consumption and actual site usage.

Shrinkage Elimination

Prevents unaccounted steel bar cutting scrap or cement bag shortages by requiring proof of actual placement before new indent approvals.

MATERIAL AUDIT // PLANNED VS ISSUED SITE CONSUMPTION
Material Item BOQ Sanction Received Site Issued Variance
OPC Cement (Bags) 1,000 800 750 -250
TMT Steel 16mm (Kg) 12,000 10,000 9,200 -2,800
River Sand (m³) 150 140 120 -30
MODULE 06

Live Stock Ledger & Automatic Reorder Alerts

Business Capability

Maintains real-time closing stock balances for steel yards, cement godowns, and raw aggregate piles across every site.

Capital Optimization

Avoids over-purchasing and tied-up working capital by warning purchasing managers when site stores hold sufficient material for the upcoming week.

STOCK BALANCE AUDIT PERPETUAL LEDGER
Material Opening Receipts Issues Balance Inventory Health
TMT Steel Rebars 200 0 50 150 Adequate
53-Grade Cement 300 500 650 150 Reorder Alert
Red Clay Bricks 5,000 2,000 3,500 3,500 Adequate
MODULE 07

Central Holding Yards & Regional Warehouse Distribution

Business Capability

Manages central yards and warehouse facilities. Supports inter-site stock transfers with dual sign-off delivery challans.

Inter-Site Transfers

Transfer surplus materials from a completed development to a new project site without raising duplicate purchase orders.

REGIONAL WAREHOUSE MATRIX MULTI-DEPOT VIEW
Material Stock Central Holding Yard Whitefield Depot Airport Site Store
Cement (Bags) 400 120 60
TMT Steel (Kg) 8,000 2,500 0
Manufactured Sand (m³) 40 25 10
MODULE 08

Site Godown & Storekeeper Daily Work Register

Business Capability

The on-site ledger for storekeepers: track unloading against delivery notes, log daily issues to subcontractors, and record unused material returns.

Subcontractor Reconciliation

Match raw materials issued to labor contractors with their measured work billings before releasing weekly payments.

SITE STORE ENTRY // GATE BOOK CHALLAN VERIFIED
Date Material Inward (GRN) Issued to Work Site Balance
02 Oct Steel Rebars 12mm 100 0 100
04 Oct Steel Rebars 12mm 0 30 70
06 Oct Cement (Bags) 200 80 125
STAGE 03 // PROCUREMENT GOVERNANCE

Indent Releases, Vendor Bidding & Purchase Orders

03 Governance Modules Approval Pipeline
1. Site Indent 2. Vendor Comparison 3. Management Sign-Off 4. Digital PO Generation 5. 3-Way Invoice Matching
MODULE 09

Procurement Governance & Multi-Vendor Comparison

Business Capability

Compare multiple vendor quotations side-by-side evaluating basic rates, freight, unloading, GST, and credit terms.

Vendor Neutrality

Enforces transparent vendor bidding rules and stores purchase manager justifications securely for statutory audits.

TENDER COMPARISON // COMPARATIVE STATEMENT REBAR PACKAGE
Supplier Entity Basic Rate (₹/kg) Delivery Window Credit Terms Selected
Jindal Steel Dist. ₹62 5 Days 30 Days No
Rathi Infra Supplies ₹60 7 Days 15 Days L1 Awarded
Apex Metals Corp ₹63 3 Days Advance No
MODULE 10

Tiered Authorization Workflows & Mobile PO Release

Business Capability

Route purchase requests based on financial approval thresholds (e.g., site engineers up to ₹50K, project managers up to ₹5 Lakhs, directors above ₹5 Lakhs).

Fast Mobile Approvals

Directors can review, approve, or return urgent site purchase requests from their smartphone within seconds.

PENDING AUTHORIZATION QUEUE ROUTING ACTIVE
Indent Item Originator Estimated Value Pending With Status
5 MT Fe550D Rebars Site Engg. ₹3,00,000 Purchase Head Pending
500 Bags OPC Cement Site Engg. ₹1,85,000 Managing Director Approved
Fine Aggregates (40 m³) Site Engg. ₹52,000 Resident Engg. Returned
MODULE 11

Purchase Order (PO) Management & GRN Reconciliation

Business Capability

Generates binding POs with GST breakdowns and delivery milestones. Tracks partial dispatches and flags outstanding vendor delivery commitments.

Three-Way Matching

Accounts only clear invoices after verifying the PO, gate Goods Receipt Note (GRN), and physical weighment slip together.

PURCHASE ORDER REGISTER PO TRACKER
PO Code Vendor Entity Ordered Delivered Pending Delivery State
PO-1021 Ultratech Dealer 500 Bags 300 Bags 200 Bags Partial
PO-1022 Jindal Steel 5 Tons 5 Tons 0 Completed
PO-1023 Cauvery Sand 40 m³ 0 40 m³ Open
STAGE 04 // WORKFORCE AUDIT

Site Operations, Geotagged Attendance & Access Control

02 Governance Modules Field Auditing
MODULE 12

Geofenced Site Attendance & Labor Roll

Business Capability

Engineers and supervisors check in using GPS coordinates and device timestamps. Confirms staff are physically on-site before clocking in.

Ghost Labor Elimination

Blocks off-site check-ins and provides real-time headcounts across multiple active sites.

GEOFENCE MUSTER ROLL // GPS VERIFIED REAL-TIME PUNCH
Staff Member Site Deployment Punch In GPS Coordinates Verification
M. Kumar (Site Engg) Zenith Heights 08:02 AM 12.9716° N, 77.5946° E Geofence Pass
P. Sharma (QC Incharge) Zenith Heights 08:15 AM 12.9714° N, 77.5944° E Geofence Pass
A. Khan (Surveyor) Metro Logistics - Location Out of Bounds Rejected
MODULE 13

Role-Based Access Control (RBAC) & Governance

Business Capability

Defines clear permissions for site engineers, storekeepers, quantity surveyors, accountants, and directors.

Commercial Confidentiality

Prevents site engineers from viewing vendor prices or client balances, and restricts junior storekeepers to material inward entries only.

SECURITY PERMISSION MATRIX RBAC PROTOCOL
System Role Commercials Create Indent Issue Store Approve PO
Company Owner Full Full Full Full
Site Engineer No Yes Yes No
Head of Accounts Full Read No Limited
STAGE 05 // FINANCIAL COMMAND

Client Collections, Vendor Payables & Profitability

05 Financial Modules Cash Flow Master
MODULE 14

Stakeholder Master & Ledger Balances

Business Capability

A unified commercial directory tracking client billing ledgers, trade suppliers, and labor subcontractors across all active projects.

Working Capital Overview

Instantly view net client receivables alongside pending vendor liabilities to plan monthly cash flow needs.

COMMERCIAL STAKEHOLDER DIRECTORY LEDGER SUMMARY
Account Entity Category Assigned Sites Net Balance (₹)
Ultratech Cements Ltd Vendor 3 Sites ₹1,25,000 (Cr)
Prestige Estate Developers Client 1 Site ₹6,00,000 (Dr)
Tata Steel Distributors Vendor 2 Sites ₹0.00 (Settled)
MODULE 15

Client Milestone Billing & Cash Recovery

Business Capability

Raise Running Account (RA) bills against certified site milestones. Track work approvals, retention deductions, and overdue receivables.

Inflow Recovery

Identifies overdue client stage payments, helping follow up on collections before starting the next construction phase.

MILESTONE RA BILLING // INFLOW LEDGER CERTIFIED PROGRESS
Client Account Certified RA Bill Collected Receivable (₹) Status
Prestige Tower A ₹10,00,000 ₹4,00,000 ₹6,00,000 Partially Paid
Brigade Commercial ₹5,00,000 ₹5,00,000 ₹0 Cleared
Salarpuria Infra ₹3,00,000 ₹0 ₹3,00,000 Overdue
MODULE 16

Vendor Payables & Payment Scheduling

Business Capability

Manages vendor payment schedules, invoice aging, retention holdbacks, and payment runs across all active project sites.

Credit Health

Helps prevent missed supplier deadlines to maintain trade credit terms and ensure steady material deliveries.

ACCOUNTS PAYABLE // AGING QUEUE OUTFLOW SCHEDULE
Vendor Entity Tax Invoice Disbursed Pending Due Due Date Status
Shree Cements ₹2,00,000 ₹1,25,000 ₹75,000 20 Oct Pending
Jindal Steel ₹3,10,000 ₹3,10,000 ₹0 - Settled
Cauvery Aggregates ₹1,40,000 ₹0 ₹1,40,000 12 Oct Due Today
MODULE 17

Live Budget vs. Actual Expenditure Analysis

Business Capability

Compares sanctioned budget line items against actual site expenses (materials, machinery, labor, subcontracts, and site overheads).

Cost Overrun Safeguard

Alerts management when site expenses approach budget thresholds, preventing unapproved cost overruns.

CAPEX VARIANCE // BUDGET AUDIT HEAD-WISE SPEND
Cost Component Approved Capex Actual Booked Variance Surplus
Direct Materials ₹30,00,000 ₹21,00,000 ₹9,00,000
Labour Subcontracts ₹12,00,000 ₹8,00,000 ₹4,00,000
Plant & Equipment ₹8,00,000 ₹3,00,000 ₹5,00,000
Total Consolidated ₹50,00,000 ₹32,00,000 ₹18,00,000 Under Budget
MODULE 18

Operating Profitability & Realized Margin Tracking

Business Capability

Compares certified project billings against all realized direct and indirect expenses, calculating real operating margins per site.

True Financial Health

Evaluates project performance using actual booked costs and accrued liabilities, rather than relying on current bank balances alone.

OPERATING MARGIN // EXECUTIVE P&L MARGIN VERIFIED
Accounting Line Item Realized Value (₹) Revenue Share
Certified Project Revenue 1,00,00,000 100.0%
Material Cost Outflow (50,00,000) 50.0%
Civil Subcontracting Cost (22,00,000) 22.0%
Equipment & Overheads (8,00,000) 8.0%
Net Operating Margin ₹20,00,000 20.0% Realized Margin
STAGE 06 // AUDIT & COMPLIANCE

Executive Intelligence & Central Management Reporting

Executive Reporting Board Ready
MODULE 19

Consolidated Management Reports & Audit Exports

Business Capability

Generate portfolio-wide reports covering open purchase orders, inventory aging, material consumption variance, and contractor billings. Export directly to Excel or PDF.

Board-Ready Reports

Saves management hours when preparing reports for director reviews, banking valuations, or statutory audits.

EXECUTIVE PROCUREMENT AUDIT REPORT EXCEL/PDF READY
PO Code Supplier Entity Date Issued Total Value (₹) Delivery Status
PO-1021 Ultratech Dealer 03 Oct 3,00,000 Partially Received
PO-1023 Cauvery Aggregates 05 Oct 1,20,000 Challan Awaited
PO-1022 Jindal Steel 01 Oct 3,10,000 Completed
VERIFIED CASE OUTCOMES

Proven Results for Real Estate Developers & Civil Contractors

Real results from builders who replaced manual site registers with NifTycoon NOMS-C.

Civil Infrastructure 3-Month Implementation

Manan Constructions: 30% Cost Savings Across 15 Sites

Managing 15+ concurrent sites led to material wastage, contractor coordination issues, and unexpected budget overruns. Implementing centralized BOQ and procurement reduced material waste by 25% within 60 days.

30%
Cost Saved
40%
Faster Work
25%
Less Scrap
100%
BOQ Track

"NOMS-C gave us centralized control over our site engineers and godowns. Material leakage was cut by 25% in the first two months."

Santosh M | Manan Constructions
Commercial Real Estate 2-Month Implementation

VM Developers: Unified Sales, Milestone Billing & Subcontracting

A commercial property builder struggled with manual client collection registers and untracked contractor payouts. NOMS-C streamlined collections and improved cash turnaround by 40%.

40%
Sales Cycle
100%
Lead Track
50%
Billing Speed
95%
Satisfaction

"Connecting client billings, payments, and site work stages in one place has accelerated our milestone cash recovery."

Vinay M | Director, VM Developers
SCHEDULE SYSTEM EVALUATION

Deploy NOMS-C Across Your Sites

Connect with our engineering software specialists. We configure the demo around your real-world BOQ templates, site store processes, and management approval hierarchies.

Role-Based Security
Encrypted multi-site data isolation with custom permissions.
Guided Onboarding
Direct migration of historical master spreadsheets and active vendor databases.

Book an Executive Demo & Free Trial

Fill in your organization details to schedule a live walkthrough.

Enterprise-grade confidentiality. No third-party data sharing.